Global Site
Outline

Installation Flow

Check requirement and necessary condition Our sales representative visits customer and
confirm the requirements.
1~2months
Make an outline proposal Make an outline proposal that is based on the
customer’s requirements.
Confirm details Our sales engineer confirms the details about the
customer’s office equipments and asks the
customer’s requirements.
Make a detailed proposal Make a detailed proposal that includes
thecustomer’s requirement.
Place an order Place an order and make a contract. 2~3months
Installation Besic scheme design, operational design、detailed engineering、building systems、test.
Start Services Shift an outside line and start services
Construction and switching to the outside line and
start the services.

コメントは受け付けていません。